★ Golden Edition
Consumer Help · Golden Edition

Get poor building work put right or your money back

Make a builder fix defective work or pay you back, using your Consumer Rights Act rights, a surveyor's report, card protection and small claims if needed.

Estimated time: 3–5 hours to build your case; most disputes settle or reach court within 2–6 monthsUpdated: 12 October 2026

This guide is for homeowners in England and Wales whose builder, roofer, plasterer, landscaper or other tradesperson has done poor, unfinished or dangerous work and will not put it right. It starts where the regular guides on resolving a builder dispute and making a small claim stop: you will pin down what was agreed, prove the defects with an independent report, use the Consumer Rights Act 2015 remedies in the right order and turn the problem into a figure a court would recognise. By the end you will have a repair demand, a surveyor's brief, a letter before claim and a clear decision on card claims, trade schemes and small claims. It is general information, not legal advice; Citizens Advice can help you check your position, and Scotland and Northern Ireland have different court procedures.

Why this is a Golden Edition guide: It turns a stressful builder dispute into a costed, evidence-led claim, with the exact letters, surveyor brief and escalation order that get results.

What is inside

  • Full step-by-step method9 detailed steps with decision points
  • Ready-to-use templatesLetter requiring the builder to put the work right · Brief for an independent surveyor or engineer · Letter before claim
  • Timed action plan8 stages from “Day 1” to “After judgment”
  • Costly mistakes to avoid4 traps and what to do instead
  • Complete checklist12 items to tick off
  • Insider tips and fixes4 tips and 4 common problems solved

Step by step

  1. Make it safe and stop the money flowing

    If the work is dangerous, such as a sagging lintel, exposed wiring, a leaking roof or a wall out of plumb, make the area safe first and get an urgent opinion from a structural engineer, a registered electrician or your council's building control team. Do not pay any further stage payment for work you are disputing, but if the contract says you owe money for other completed stages, pay that part so you are not the one in breach. A useful rule is to hold back only what reasonably reflects the cost of putting the defects right, and to say in writing that this is what you are doing and why. Do not let another firm start repairs yet unless it is an emergency, because you would destroy evidence, and the Act's first remedy is for the original builder to put the work right; a court will ask whether you gave them a fair chance. If you must do emergency repairs, photograph everything before and after and keep the invoices, as you can claim them later.

★ Golden Edition · Members

The full Golden Edition guide is for members

Members get the complete guide: every remaining step, 3 ready-to-use templates, a timed action plan, costly mistakes to avoid, the full checklist, insider tips and fixes for common problems. Golden Edition guides are included in membership at no extra cost, together with every other ABCDayZ guide.

£3.99 for 1 month or £29 for 12 months. One payment, no automatic renewal.

Unlock all guides

Already a member on another device? Open your personal access link. Bought Programming with AI? Your first month is included.